Kerang, Victoria
BGB Electrical Services
AusNet Services
Powercor
Ventia Energy
Beca
2024
N/A
AND Network was engaged to lead construction and commissioning project management for the grid connection of the Kerang Solar Plant a 29.9 MW, 37.8 MVA utility-scale solar farm. The works required a new 22 kV feeder connection at Kerang Terminal Station, integrating into AusNet's live HV network. AND Network coordinated construction delivery across a complex multi-party environment managing interfaces between AusNet, Powercor, BGB, and Ventia, across primary switchyard works, secondary protection and control upgrades, and full SCADA commissioning.
The project was successfully constructed and commissioned within a complex live-network environment, enabling the 29.9 MW solar plant to connect to Victoria’s electricity network.